Bindery

Moving machines

For a recent bindery move, I opted to work with riggers for the first time since I was moving the machines to ground level rather than loading dock-to-loading dock. Thornley-DeGrasse riggers moved my guillotine and board shear thoughtfully, creatively solving problems along the way – including carefully rigging some tree branches.

Here is a 59 second video capturing the 2 1/2 hours:

Soundtrack: “Jig” by 2×4